MIL-A-81371(AS)
procedures will be provided and may be used when their use is approved by the procuring
activity. However, the right is reserved by the procuring activity to require modification
of such procedures, including additional tests, when deemed necessary.
Reconditioning of Tested Equipment - Equipment which has been sub-
4.7
jected to acceptance and life tests shall be reconditioned by the contractor by replacing all
wear or damaged items. After reworking the contractor shall resubmit the equipment for
acceptance.
Presubmission Testing - No item, part or complete equipment shall be
4.8
submitted by the contractor until it has been previously tested and inspected by the con-
tractor and found to comply, to the best of his knowledge and belief, with all applicable
requirements.
Rejection and Retest - Equipment which has been rejected may be
4.9
reworked or have parts replaced to correct the defects and resubmitted for acceptance
Before resubmitting, full particulars concerning previous rejection and the action taken to
correct the defects found in the original shall be furnished to the government inspector
5.
PREPARATION FOR DELIVERY
5.1
General - All major units and parts of the equipment shall be preserved,
packaged, packed and for the level of shipment specified in the contract or order in
accordance with Specification MIL-E-17555.
6.
NOTES
6.1
Intended Use - The equipment shall be used in conjunction with the items
listed in 6.9.1 to fulfill the requirements of Programmer, Aircraft Weapons Release Set
-
-
MX-7016 (*)/AWE-l as described in Specfication MIL- P- 81361(AS).
Test Values - Normal and limiting values of performance data shall be
6.2
determined at input voltages of 27.5 + 0. 5 vdc and 115 + 1.O vac as applicable. These data
are to be used in testing the equipment at installation points for compliance with minimum
acceptance standard of performance.
Performance objectives - Minimum size and weight, simplicity of oper-
6.3
ation, ease of maintenance, and an improvement in the performance and reliability of the
specific functions beyond the requirements of this specification are objectives which shall
be considered in the production of this equipment. Where it appears a substantial reduction
in size and weight or improvement in simplicity of design, performance, ease of maintenance
or reliability will result from the use of materials, parts and processes other than those
specified in Specification MIL-E-5400, it is desired their use be investigated. When inves-
tigation shows advantages can be realized, a request for approval shall be submitted to the
procuring activity for consideration. Each request shall be accompanied by complete
supporting information.
As a general rule nonrepairable subassemblies should be encapsulated or
6.4
hermetically-sealed. The number of connections internal to the subassembly should be held
.
13
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business