MIL-C-81360(AS)
3.5.1.6
Electrical Connections - Connections to external circuits shall be pro-
vided as indicated in figure 2.
3.6
Design Data - No data is required by this specification (other than re-
ports accompanying samples submitted for testing) or by applicable documents, unless
specified in the contract or order (see 6. 7).
4.
QUALITY ASSURANCE PROVISIONS
4.1
Responsibility for Inspection - Unless otherwise specified in the contract
or purchase order, the supplier is responsible for the performance of all inspection re-
quirements as specified herein. Except as otherwise specified, the supplier may use his
own facilities or any commercial laboratory acceptable to the Government. The Government
reserves the right to perform any of the inspections set forth in the specification where such
inspections are deemed necessary to assure that supplies and services conform to pre-
scribed requirements.
Classification of Tests - Items covered by this specification shall be
4. 1.1
subjected to the following tests to determine compliance with all applicable requirements:
(1) Preproduction tests
(2) Initial production tests
(3) Acceptance tests
(4) Life tests
4.2
Preproduction Tests - Preproduction tests shall be made on an equipment
representative of the production equipments to be supplied under the contract. Preproduction
tests shall be accomplished under the responsibility of the contractor and shall be conducted
in accordance with the approval test procedure of 4.6. The Government inspector and the
procuring activity shall be advised when tests are to be conducted so that a representative
may be designated to witness or supervise the tests when so desired. Contractors not having
adequate facilities to conduct all required tests shall obtain the services of a commercial
testing laboratory acceptable to the Government.
4.2.1
Preproduction Test Data - The contractor shall submit all data collected
in conducting these tests to the procuring agency for reviews and approval. On first pro-
duction contracts, this data shall include a list of all electrical and electronic parts giving
their specified voltage, current and temperature rating and the applied circuit voltage,
current and ambient and surface temperatures. The. ambient and surface temperature shall
be obtained under the extreme high temperature operating conditions.
4.2.2
Scope of Tests - Preproduction tests shall include all tests deemed nec-
essary by the procuring activity to determine that the equipment meets all the requirements
of this specification and the contract. Preproduction tests shall include environmental tests
in accordance with the procedures of Specification MIL-T-5422 and interference tests in
"accordance with Specification MIL-I-6181.
6
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business